Stainless Steel Sink Manufacturers Tells You How To Install Dif

  • The Stainless Steel Sink Manufacturers tells you how to place the small details in the kitchen correctly.

    First, the sink

    1. If the sink is installed in front of the window sill, consider the height of the faucet and whether it will affect the opening and closing of the window.
      2. Before installing the water tank, be sure to drain the water from the water pipe to avoid water leakage and rust in the water tank.
      3. When installing the water tank, be sure to pay attention to the firmness of the joint to prevent water leakage in the future. Also pay attention to the location of the hot and cold water pipes, do not make a mistake.

    Second, smoking machine

    Top suction hood:
    1. The installation height is from 650mm to 750mm from the top of the cooker pot to the bottom of the hood.
    2. the fuselage is large, not suitable for installing the cabinet.
    3. The fumes produced by Chinese food are larger, and it is more suitable to use the top suction type hood.

    Side suction hood:
    1. The installation height is from 300mm to 400mm from the top of the cooker pan to the bottom of the hood.
    2. the fuselage is small, you can install the cabinet to increase storage space.
    3. Because the smoke from the Western food and the light meal is smaller, it is more suitable to use the side suction type hood.
    4.hydropower configuration

    Third, the design principle of water supply pipeline

    The principle of proximity: from the original point to the new point of routing, choose the original point of the nearest point from the new point, can not be far-reaching.

    Pipeline trend

    1. The cold and hot water pipe renovations are all going to the top.
      2. There is a water point under the window, and the water pipe can go to the ground to lead to the water point.

    Avoidance principle

    1. The electric pipe is laid on top, and the water pipe is arranged under the electric pipe.
      2. The height of the ceiling is allowed. The cold and hot water pipes can be laid up and down to avoid turning and hot and cold.

    Laying principle

    1. The original point is available, or the distance between the original point and the newly added point is <200mm. Only the end of the original point is replaced, and the hose is used to lead to the sanitary appliance.
      2. The distance between the original point and the newly added point is >200mm, and the water pipe needs to be led to the new point along the top surface (in special cases, it can be led along the ground).

    Fourth, electrical wiring design principles

    The principle of proximity: from the original point to the new point lead, select the original point lead closest to the newly added point, and you can't go far.

    Lead principle
    1. Add new lead wires, and cross-circuit and cross-region leads are strictly prohibited.
    2. There is no breakpoint modification in the weak point loop, and the shift needs to be re-lead from the distribution box.

    Slotting principle
    1. The new wall is allowed to open a horizontal groove of less than 1000mm.
    2. The original wall of the non-bearing wall is allowed to open a transverse groove of less than 200mm.
    3. The original wall of the load-bearing wall is strictly prohibited from opening horizontal grooves.

    Lighting circuit
    1. Double control switch lighting circuit wiring: one switch is connected to the lamp through the top line pipe, and the two switches are connected by the ground wire pipe to realize double control.
    2. bathroom lighting can be the same circuit with the socket.